Honeywell EXCEL 5000 User Manual page 232

Open system control icons
Hide thumbs Also See for EXCEL 5000:
Table of Contents

Advertisement

ALPHABETIC REFERENCE
WIA Operation Diagram
74-5577–33 (US)
EN2B-0184 GE51 R0518 (Europe)
X1=1
YES
Access Priority
YES
X3=0
YES
Write Attributes
END
Priorities
Each point type has associated priorities that WIA and operator commands follow.
There are two priorities for each point, command and residual. Priority is a number
from 0 through 255. The command priority sets the level required to change the
point. The residual priority sets the level required to changed the point again after
the point is changed.
For example, if a point has a priority of 50, then a command to change the point
must have a priority of at least 50. If that command also has a residual priority of 10,
software changes the required priority to 10 for the next command.
Control strategy, switching logic, and Time Programs do not adhere to priorities with
one exception. This exception is when they command the point to a manual value
(operation status). If a point is in manual status, control strategy, switching logic, and
Time Programs cannot command the point.
CAUTION
Placing a point in manual mode using WIA can lock out even an operator
command.
In WIA, the X2 and X3 fields determine command (X2) and residual (X3) priority.
Operator priorities are fixed according to the level of the operator:
Operator
Level
3
4
5
NO
X2>
NO
NO
Set New
Access Priority
Command
Priority
60
80
100
234
EXCEL CARE CONTROL ICONS
Residual
Priority
point's residual is not changed
point's residual is not changed
point's residual is not changed

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents