When To Calibrate; Initial Settings; Adjustment Procedure; Figure 6-14 Opened Uba_Adjtool File Screen - JCM GLOBAL UBA Series Operation And Maintenance Manual

Universal bill acceptor
Table of Contents

Advertisement

Programming, Calibration & Test Universal Bill Acceptor (UBA-1x-SS & UBA-x4-SS/SU)
Mag Tool Kit (JAC Part #701-000086RA). Kit
includes Calibration Papers (White, Black &
UV) and the Mag Tool as well.
MAG Tool US Power Cable (JAC Part #300-
100007RA).
Adjustment Program (ADJTOOL_V1.06-
4.exe,comm.ini and adj.ini) available
at www.jcmglobal.com.

When to Calibrate

1. After a Bill Acceptor component has been
disassembled for repair.
2. After a sensor board has been replaced.
3. If a CPU Board is replaced.

Initial Settings

1. Make sure that the UBA jumper setting are
in the photo-coupler isolation position.
2. Connect the two External Power Supply
Communications cables between the UBA
and PC Serial Port respectively (See Figure
6-13).
3. Set UBA Front Panel DIP Switch 8 to ON,
and supply power to the External Power
Supply unit.
4. Create and name a new folder on your PC
5. Save the decompressed "
","
Vxxx.exe
comm.ini
" adjustment programs in the
"
adj.ini
newly created folder.

Adjustment Procedure

To begin adjusting the UBA Unit proceed as
folows:
NOTE: The UBA Unit muust be in a Frame
for calibration!
1. Double click on the latest version of the
UBA_ADJTOOL_ Vxxxx.exe. applica-
tion and the Figure 6-14 Screen will appear.
a
b

Figure 6-14 Opened UBA_ADJTOOL File Screen

2. Check that the PC's COM Port number being
used agrees with the Port to which the UBA
JCM Part No. 960-000097R_Rev. 3
ADJTOOL_
" and
6 - 5
is connected by clicking on the
down Tab (See Figure 6-14 a) and selecting
"RS232C".
3. In the Dialog Box that appears (See Figure
6-15), select the COM Port to which the
UBA is connected, and Mouse-click on the
Select
Screen Button (See Figure
6-15).

Figure 6-15 COM Port Selection Screen

4. Turn UBA DIP Switch #8 ON, apply power
to the UBA, then turn DIP Switch #8 OFF.
5. Click
to begin the UBA Adjustment
program (See Figure 6-14 b). The automatic
Motor Speed Check Test will run, and a Dia-
log Box Window will then ask for the
"White" Reference paper to be set in place
(See Figure 6-16).

Figure 6-16 White Reference Test Screen

6. Open the UBA's Upper Guide, Insert the
White Reference Paper (See Figure 6-18
), firmly close the Guide Cover
(See Figure 6-18
) and Mouse-Click on
the
Screen Button.
OK

Figure 6-17 Black Reference Test Screen

© 2010, JCM American, Corporation
Section 6
Pull-

Advertisement

Table of Contents
loading

Table of Contents

Save PDF