Final Timing Belt Disassembly; Figure 4-39 Pusher Mechanism Separation; Figure 4-40 Cover Roller Removal; Figure 4-41 Timing Belt Removal Access - JCM GLOBAL UBA Series Operation And Maintenance Manual

Universal bill acceptor
Table of Contents

Advertisement

Disassembly/Reassembly

Figure 4-39 Pusher Mechanism Separation

Final Timing Belt Disassembly

Perform the following steps to remove the final
UBA Timing Belts:
1. Remove the two (2) screws located on each
side of the Belt Housing.
2. Remove the Cover Roller in the direction of
the large arrow in Figure 4-40.

Figure 4-40 Cover Roller Removal

3. Remove the two (2)
Clips, its related Parallel Pin, and its Ø 6B
Bushing (See Figure 4-41 a).
4. Remove the E-Clip retaining the Bracket
Gear assembly in place (See Figure 4-41 b
5. Lift the Bracket Gear assembly up and off
the Transport Unit (See Figure 4-41 b
6. Remove "Gear M1-Z12 (P-1)" (See Figure
4-41 c).
JCM Part No. 960-000097R_Rev. 3
Universal Bill Acceptor (UBA-1x-SS & UBA-x4-SS/SU)
E-
"Drive Gear (24)"
).
1
).
2
4 - 1 3

Figure 4-41 Timing Belt Removal Access

7. Remove the second Ø 6B Bushing E-Clip
retainer, then remove the second Ø 6B Bush-
ing (See Figure 4-41 d).
8. Release the Left Pressure Spring's tension in
the Shaft Roller Pit as indicated in the Figure
4-41 (e) exploded view.
9. Pull the Right Pusher Guide upward, and
remove the Timing Belts.(See Figure 4-42).

Figure 4-42 Timing Belt Removal

The Disassembly Procedure is now complete.
Reverse all of the proceeding instructions to
reassemble any of the components described
during this disassembly procedure.
© 2010, JCM American, Corporation
Section 4

Advertisement

Table of Contents
loading

Table of Contents