12. Remove the three (3) E-Clips securing the
Transport Drive Shaft end and internal Drive
Pulleys from Transport Drive C (See Figure
4-32 a).
13. Pull the Transport Drive Shaft out and
remove the two (2) Drive Pulleys along with
the two (2) adjacent Parallel Pins all up and
out of the assembly as the Transport Drive
Shaft is withdrawn (See Figure 4-32 b).

Figure 4-32 Transport Drive Shaft Removal

14. Push the end of Pulley Shaft #2 in, and pull it
out in the direction indicated by the arrow
shown at Figure 4-32 (c), and remove the
two (2) Transport Pulleys up and out of the
assembly as Pulley Shaft #2 is withdrawn.
15. Remove the five (5) E-Clips securing the
end and internal Drive Pulleys on Transport
Shaft #2 of Transport Drive C.

Figure 4-33 Drive Belt Removal

JCM Part No. 960-000097R_Rev. 3
Universal Bill Acceptor (UBA-1x-SS & UBA-x4-SS/SU)
4 - 1 1
16. Pull Transport Shaft #2 out of Transport
Drive C (See Figure 4-33 a).
17. Lift Drive Pulleys #1, #2 and #3 and their
adjacent two (2) Parallel Pins up and out of
the assembly as Transport Shaft #2 is with-
drawn (See Figure 4-33 b).
18. Remove the three freed Timing Belts from
the assembly.
NOTE: Reinsert the Parallel Pins into Drive
Pulleys #1 and #2 only! No Parallel Pin is
required for Drive Pulley #3.

Transport D Solenoid Removal

Perform the following steps to remove the UBA
Transport Drive D Solenoid:
1. Remove the four (4) Solenoid Base mount-
ing screws securing the Solenoid Base Cover
to Transport Guide D (See Figure 4-34 a).

Figure 4-34 Transport Guide D Solenoid Removal

2. Remove the Solenoid Base Cover.
3. Remove the two (2) Solenoid mounting
screws from the bottom side of Transport
Guide D and lift the Solenoid up and out of
the assembly (See Figure 4-34 b).
Cash Box Handle and Intelligent Cash
Box ICB Module Unit Disassembly
C
B
H
R
ASH
OX
ANDLE
EMOVAL
Perform the following steps to remove the UBA
Standard and Intelligent Cash Box (ICB) Handle:
1. Remove the two (2) Cash Box Handle
mounting screws (See Figure 4-35).
2. Remove the Handle Caps and lift the Handle
off of the assembly.