Front Access Door Removal; Figure 4-3 Side And Top Cover Removal; Figure 4-4 Side Cover Installation Points; Figure 4-5 Transport Cover Removal - JCM GLOBAL UBA Series Operation And Maintenance Manual

Universal bill acceptor
Table of Contents

Advertisement

Section 4
1. Pull the release lever located on top of the
Unit and fully open the Transport (TR) Sec-
tion of the Acceptor's Cover in the direction
of the large arrow shown in Figure 4-3 a.

Figure 4-3 Side and Top Cover Removal

WARNING: Hold the Upper Guide open
while removing the right and left
Transport (TR) covers, because it does
not stay in the upright position by itself.
Improper handling may result in
personal injury and/or damage to the
equipment.
2. Fully open the front access door (See Figure
4-3 b).
3. Lift and hold points
TR Side Cover (See Figure 4-3
c
Figure 4-4
&
1

Figure 4-4 Side Cover Installation Points

JCM Part No. 960-000097R_Rev. 3
Universal Bill Acceptor (UBA-1x-SS & UBA-x4-SS/SU)
and
open on each
c
c
&
and
1
2
c
).
2
4. Slide each Cover in the direction indicated
by the small arrows shown in Figure 4-3
c
&
to remove each side cover.
2
5. To remove the Transport Cover, release six
(6) Tabs; three located on each side of the
Transport Cover using a Flathead Screw-
driver (See Figure 4-5).

Figure 4-5 Transport Cover Removal

6. Remove the Transport Cover upward by lift-
ing up the Front Cover.
7. To re-attach the Side Covers to the Unit,
place them in their proper position on each
side of the Unit.
8. Hold points
Cover, (See Figure 4-3) and slide them in the
reverse arrow direction as previously shown
in Figure 4-4.

Front Access Door Removal

Perform the following steps to remove the UBA
Front Access Door:
1. Turn the Acceptor Unit upside down.
2. Remove the screw located on the side of the
Front Access Door to release the Front
Grounding (FG) Harness (See Figure 4-6 a).
3. Fully open the Front Access Door and
release the Acceptor Latch Spring Lock (See
exploded view inset in Figure 4-6 b).
4. Unscrew two screws located on the shaft and
slightly widen the UBA Transport Unit in the
directions of the small arrows shown in Fig-
ure 4-6 b, and remove the front access door
from the Transport Unit in the large arrow
direction (See Figure 4-6 c).
NOTE: When re-assembling the Front Door,
tighten the two (2) screws located on the
shaft to a torque of 42.67 psi (3.0kgf/cm
© 2010, JCM American, Corporation
4 - 2
Disassembly/Reassembly
,
and
on each Side
c
1
2
)
.

Advertisement

Table of Contents
loading

Table of Contents