5.1.2 ELECTRICAL REQUIREMENTS
The facility should provide the following electrical power outputs for Cycraft:
Input Voltage
Frequency
Rated Current (Max)
Peak Current (Max)
Building Circuit Breaker
(Recommended)
Note:
The average power requirement is measured power consumption during
normal operation. Peak power requirement is theoretical short-term peak power
possible for short times during special driving conditions.
recommended that facility power to be based on peak power requirements for the
best results.
5.2 EQUIPMENT REQUIRED FOR INSTALLATION
No
Tools
1
Philips
screwdriver
2
Wrench
(19 mm ~ 27 mm)
3
Hex Key
( 6mm)
4
Hex Key
( 5mm )
5
Hex Key
(2.5 mm)
6
Spanner (22 mm)
Single Phase
AC 200V, 208V, 220V, 230V, 240V
50 / 60 Hz
8.5 Amp
10 Amp
13 Amp
Description
type
Page 24
Therefore, it is
Q'ty Purpose
1
Loosening and securing
truss bolts
1
Adjusting the levers.
1
Boarding step,
Coin Chute Tower
1
Fence
1
Photo sensor, mirror
2
Turnbuckle
Safety Link
Need help?