Gas Pipe Chart (Natural Gas) - Maytag MDE17CS Service Manual

New dependable care commercial single and stack gas and electric dryers 50 hertz models
Hide thumbs Also See for MDE17CS:
Table of Contents

Advertisement

The chart shows the maximum capacity in
terms of cubic feet of gas per hour, for various
sizes of pipe at lengths of from 10 feet to 200
feet. The column on the left is the nominal
iron pipe size shown in inches. Sizes range
from 1/4" to 4". The next column shows the
internal diameter of the pipe in decimal inches.
The numbers across the top of the chart are
lengths of pipe from 10 feet up to 200 feet.
The numbers in the body of the chart are
maximum capacities of cubic feet of gas per
hour.
To determine the cubic feet of gas required
per hour, divide the total BTU input of all the
dryers which will be on the line by the average
BTU heating value per cubic foot of the gas
used.
Nominal
Internal
iron
diameter
10
pipe
inches
size,
inches
1/4
.364
32
3/8
.493
72
1/2
.622
132
3/4
.842
278
1
1.048
520
1 1/4
1.380
1050
1 1/2
1.610
1600
2
2.087
3050
2 1/2
2.169
4860
3
3.068
8500
4
4.026
17,500 12,000 9700 8300 7400 6800 6200 5800 5400 5100 4500 4100 3800 3500

GaS PiPE CHarT (NaTural GaS)

20
30
40
22
18
15
49
40
34
92
73
63
190
152
130
350
285
245
730
590
500
1100
890
760
2100
1650 1450 1270 1150 1050
3300
2700 2300 2000 1850 1700 1600 1500 1400 1250 1130 1050
5900
4700 4100 3600 3250 3000 2800 2600 2500 2200 2000 1850 1700
EXAMPLE:
The dryer has a rating of 30,000 BTU. If the
average BTU rating of natural gas is 1000,
divide 30,000 by 1000 and get 30. If for
example, eight dryers are to be operated on a
gas line, the following figures would be used:
30
X 8 Dryers
240 Total cubic feet of gas per hour
Let's assume 40 feet of pipe is required.
Here's how to use the chart:
1.
Look across the top of the chart and find 40
feet of pipe.
2.
Look down into the body of the chart to get
to, or just over the maximum needed cubic
feet of gas per hour. In this case it will be
245.
3.
Look to the left column and see a 1" pipe is
required.
Length of pipe, feet
50
60
70
80
14
12
11
11
30
27
25
23
56
50
46
43
115
105
96
90
215
195
160
170
440
400
370
350
670
610
560
530
990
2-13
Cubic feet per hour each
90
100
125
150
10
9
8
8
22
21
18
17
40
38
34
31
84
79
72
64
160
150
130
120
320
305
275
250
490
400
410
380
930
870
780
710
175
200
7
6
15
14
28
26
59
55
110
100
225
210
350
320
650
610
980

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdg17csMde17mnMle24pnMdg17mnMlg24pnMlg24pd ... Show all

Table of Contents