AWC 500 Installation instruction
3.3. Recommended screws/bolts for mounting
Figure 2. Recommended installation clearance.
3.3. Recommended screws/bolts for mounting
It is recommended to mount the AWC 500 using a stainless steel M6 screw/bolt and matching plain
washer of A2-70 ISO 3506 quality or better. The screw/bolt should be tightened with 5 Nm.
3.4. Grounding the Rack
When mounting the Rack it is very important to make sure that the metal rack frame gets a solid
electrical connection with the presumed grounded cabinet. A firmly grounded Rack is important both
www.deifwindpower.com
Page 4 of 14