Recommended Screws/Bolts For Mounting; Grounding The Rack - Deif AWC 500 Installation Instruction

Advanced wind turbine controller
Hide thumbs Also See for AWC 500:
Table of Contents

Advertisement

AWC 500 Installation instruction

3.3. Recommended screws/bolts for mounting

Figure 2. Recommended installation clearance.
3.3. Recommended screws/bolts for mounting
It is recommended to mount the AWC 500 using a stainless steel M6 screw/bolt and matching plain
washer of A2-70 ISO 3506 quality or better. The screw/bolt should be tightened with 5 Nm.

3.4. Grounding the Rack

When mounting the Rack it is very important to make sure that the metal rack frame gets a solid
electrical connection with the presumed grounded cabinet. A firmly grounded Rack is important both
www.deifwindpower.com
Page 4 of 14

Advertisement

Table of Contents
loading

Table of Contents