Ball screw
(1) Pass the U2 belt through the ball screw spline
spline unit
Installation
(2) Secure the ball screw spline shaft on lower side
(3) Mount the ball screw spline unit.
(4) Grease the shaft.
(5) Install the arm top cover and arm bottom cover.
(6) Turn OFF the Controller and peripheral equipment.
(7) Install the end effector, and connect wires and tubes.
(8) This step is only for Cleanroom-model. Install the bellows.
(9) Perform the calibration of Joints #3 and #4.
G3 Rev.14
unit and U3 pulley and insert the belt to Arm #2
from above.
of Arm #2.
Be careful not to put the timing belt between the
nut and Arm #2.
For the procedure, refer to Maintenance: 8. Arm #4 – 8.2 Replacing the Timing
Belt – U2 belt installation.
For details, refer to Maintenance: 11.1. Greasing the Ball Screw Spline Unit.
For details, refer to Maintenance: 3. Covers.
For details, refer to Maintenance: 10. Bellows.
For details, refer to Maintenance: 14. Calibration.
Maintenance 11. Ball Screw Spline Unit
U2 belt
4-M4×10
161