Leica Builder T User Manual page 111

Version 4.0
Table of Contents

Advertisement

Application Programs, for Builder R, RM,
M power and RM power
Description of fields
Field
Description
<From:>
The identifier for the first measured point.
Available for Builder RM, M power and RM power.
<To:>
The identifier for the second measured point. Available for Builder RM,
M power and RM power.
Calculated horizontal distance between the measured points.
Calculated height difference between the measured points.
<Grade:>
Calculated grade [%] between the measured points.
Calculated slope distance between the measured points.
Builder
111

Advertisement

Table of Contents
loading

This manual is also suitable for:

Builder rmBuilder rm powerBuilder m powerBuilder r

Table of Contents