Leica Builder T User Manual page 126

Version 4.0
Table of Contents

Advertisement

Application Programs, for Builder R, RM,
M power and RM power
Description of fields
Refer also to the applications before.
Field
<Direction:>
<Dist.:>
<Line:>
<Offset:>
<New Point:>
<E:>
<N:>
<H:>
Builder
Description
Direction between two points.
Distance between two points.
Longitudinal offset from the start point of the baseline.
Cross offset to the baseline.
Calculated horizontal distance between two points.
Calculated height difference between two points.
The identifier for the new COGO points.
Easting of new COGO point.
Northing of new COGO point.
Height of new COGO point.
126

Advertisement

Table of Contents
loading

This manual is also suitable for:

Builder rmBuilder rm powerBuilder m powerBuilder r

Table of Contents