Siemens SITRANS FSS200 Installation Manual page 30

Ultrasonic clamp-on sensors
Table of Contents

Advertisement

Installing/mounting
4.6 Installation instructions
Figure 4-4
Mounting supplies
The following items will be needed to mount the sensors (most materials are supplied):
● Flat blade screwdriver
● Mounting frames or mounting tracks
● Tape, chalk and a ruler or measuring tape
● Mounting straps
● Spacer bar
● Mounting guide (for Direct mount)
● Ultrasonic coupling compound and/or coupling pads
● Sensors (matched set)
Mounting strap kits
The available mounting strap kits are listed below. Each kit comes with up to two band sizes
to cover its designated pipe diameter range and a spacing guide for Direct mount. In most
cases, the kits come with the mounting hardware.
Mounting strap kits
7ME396000SM00
7ME396000SM10
7ME396000SM20
7ME396000SM30
28
Upstream sensor
Pipe
Flow direction
Direct mount (Pipe shown from above in 12 o'clock position)
50.8 mm (2-inch) to 177.8 mm (7-inch)
50.8 mm (2-inch) to 330.2 mm (13-inch) #88 (2) #152 (2)
330.2 mm (13-inch) to 609.6 mm (24-
inch)
609.6 mm (24-inch) to 1219.2 mm (48-
inch)
Downstream sensor
Sonic path
Pipe diameter
Installation Manual, 08/2017, A5E36255466-AC
SAE band sizes (Qty.)
#88 (2) #128 (2)
#188 (2) #280 (2)
#152 (4) #312 (4)
FSS200 clamp-on sensors

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents