Coupling To A Mass Spectrometer; Making The Duct To Couple With An Isq Series, Tsq 8000 Series, Dsq Ii, Or Itq Mass Spectrometer - Thermo Scientific TRACE 1310 Hardware Manual

Gas chromatographs
Hide thumbs Also See for TRACE 1310:
Table of Contents

Advertisement

Coupling to a Mass Spectrometer

Making the Duct to Couple with an ISQ Series, TSQ 8000 Series, DSQ II, or ITQ Mass
Spectrometer
Thermo Scientific
c. Plug the power cable to the AC Input connector on the front of the module and to
the wall outlet. The LED marked On lights up after the GC power on.
]
Note For further details regarding the installation of the Aux Temperature/Cryo module,
see the section
"Adding an Aux Temperature/Cryo Module"
This section provides instruction for opening the duct to introduce the transfer line inner
tube into the oven of your TRACE 1300/TRACE 1310 version for MS.
According to the mass spectrometer unit to couple, see the following sections:
"Making the Duct to Couple with an ISQ Series, TSQ 8000 Series, DSQ II, or ITQ
Mass Spectrometer"
"Making the Duct to Couple with a TSQ Quantum Mass Spectrometer"
"Making the Duct to Couple with a DFS, IRMS, or ICP-MS Mass Spectrometer"
page
29.
To make the duct for the transfer line
1. Remove the left side panel.
a. Open the front door of the GC.
b. Use a T20 Torxhead screwdriver to loosen the left side panel screw from the interior
front panel. See
Figure 27. Left Side Panel Fixing Screw
on
page
23.
Figure
27. Save the screw because it will be reused later.
Coupling to a Mass Spectrometer
on
page
443.
TRACE 1300 and TRACE 1310 Hardware Manual
1
Installation
on
page
26.
on
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1300

Table of Contents