Download Print this page

Sargent IN220 Installation Instructions Manual page 19

Poe cylindrical lock
Hide thumbs Also See for IN220:

Advertisement

IN220 Cylindrical Lock
10 Outside Reader Installation (Continued)
4. Next feed the cables/connectors through the inside mounting assembly (and gasket if required*).
5. Secure the mounting assembly while ensuring proper alignment of outside reader and partially tighten
the (2) through-bolts on the inside of the door to secure the reader (Fig. 10B).
6. Secure both ground lugs with #6-32 machine screw (Fig.10C).
*Gasket is required for outdoor installations.
If installing with gasket; separate gasket from mounting plate to feed cables/connectors
through holes as indicated (Fig. 10B).
Once cables/connectors are fed through, reattach gasket to mounting plate.
Inside of Door
Gasket*
Fig. 10B
NOTE: Cable lengths exaggerated for illustrative purposes.
Mounting Plate
Through -
bolts
Fig. 10C
1-800-810-WIRE • www.sargentlock.com • A8203A
19

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Sargent in220