Section 7 Sequence Of Operation - Bradford White Copper Brute II Installation And Operation Instructions For

Hydronic boiler model bwch water heater model bwcv sizes 500-2000
Table of Contents

Advertisement

COPPER BRUTE II (500 - 2000) INSTALLATION AND OPERATING INSTRUCTIONS
SECTION 7
7.A
3. WAIT FIVE (5) MINUTES.
7.B
Copper Brute lls follow the sequence of operations
burners associated with each ignitor as an independent
the remaining ignitor and burner(s) will operate
Standby
Upon a call for heat, the pump is energized and
Pre-Purge
condition, the Copper Brute ll locks out and transitions
to ensure proper evacuation of any unspent fuel in the
HSI Warmup
high speed, the gas valves remain off, and power is
the threshold and time requirements, or if there is a
separate lock-out condition, the Copper Brute ll will
Ignition
In Ignition, the blower continues to run at high
Three attempts for ignition, prior to lock-
Run
for heat is removed, the Copper Brute ll will transition
Inter-Purge
In Inter-purge, the blower continues to run at high
Page 71