Section 9 Maintenance - Bradford White Copper Brute II Installation And Operation Instructions For

Hydronic boiler model bwch water heater model bwcv sizes 500-2000
Table of Contents

Advertisement

COPPER BRUTE II (500 - 2000) INSTALLATION AND OPERATING INSTRUCTIONS

SECTION 9 Maintenance

9.A System Maintenance
the vent terminal and combustion air terminal (when
periods in locations where freezing normally occurs,
it should be isolated from the system and completely
the vent system is Category III, ensure that all joints
9.B
.
The gas and electric controls on the appliance are
engineered for long life and dependable operation,
but the safety of the equipment depends on their
listed below every year:
Caution
9.B.1 Burners
inspection panels(s) and ignitor(s) and inspect the
the burners that are visible, all the burners will need
which the ignitor inspection panel(s) were removed),
Clean burners, if necessary, by blowing compressed
air from the outside of the burners into the center
in the reverse order
9.B.2 Filter
it will only need replacement when unwashable,
9.B.3
The gas valves are designed to operate with supply
9.B.4 Manual Reset High Limit Control
When used, the high limit switch is a manual
water heater models and boilers ordered with low
Page 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Copper brute ii bwcvCopper brute ii bwch

Table of Contents