Bradford White Copper Brute II Installation And Operation Instructions For page 77

Hydronic boiler model bwch water heater model bwcv sizes 500-2000
Table of Contents

Advertisement

COPPER BRUTE II (500 - 2000) INSTALLATION AND OPERATING INSTRUCTIONS
9.B.7 Ignitors
They are energized whenever there is a call for heat
and switched off when ignition is established and the
power to the appliance, remove the ignitor access
9.B.8 Ignition Sensors
9.B.9 Transformer
The Copper Brute ll's transformer is not capable
as zone valves, which must have their own separate
wires, remove the mounting screws and remove the
9.B.10 Blowers
The combustion air blowers bring the combustion
air for the Copper Brute ll from the upper chamber to
ensure that the unit operates properly, by following the
9.B.11 Flow Switch
Caution
9.B.12 Heat Exchanger Coil
WARNING
is suspected, view ports for inspection of the heat
They are located below the headers, and are accessed
by opening the small round cover that is attached by
of black carbon soot or other debris on the heat
sensors from all components that are attached to
front cover(s) by removing the rubber access
venting and remove the top, by removing the
the gas train, disconnect the unions located below
located outside the cabinet, and pull up, bringing
the union end connectors through the grommets in
pan, remove the slide out control assembly and
holding the intermediate pan, and lift up to remove
Locate and remove the screws along the front,
rear and bottom of the integral metal sections, and
NOTE:
Page 77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Copper brute ii bwcvCopper brute ii bwch

Table of Contents