Before You Begin - Filtec FT-70c Service And Technical Reference Manual

Fill level inspector, for can inspection
Table of Contents

Advertisement

Before You Begin

Industrial Dynamics Company, Ltd. © Form 40256-0600
Before you begin configuring the FT-70, verify the following is
completed:
• The inspection head is completely installed and is correctly
centered and leveled over conveyor chain as explained in
Chapter 3: Installing the FT-70.
• The rejector is completely installed and is aligned correctly
with the conveyor chain as explained in the rejector manual.
• The takeaway conveyor is configured properly as explained in
the rejector manual.
• All ramp actions position the containers properly on the
conveyor chain when they reach the inspection area.
• Containers ride smoothly on the conveyor, do not slide, and
are not agitated when they reach the inspection area.
• The rejector air pressure is stable and set at the correct
pressure.
• All power cable wiring to the FT-70 and signal cable wiring to
the rejector, encoder, and any remote sensors are complete.
• The Safety Interlock Switch is turned on. This switch must be
on in order to activate the X-ray Generator.
Chapter 4: Configuring the FT-70 for Operation
4-5