Chapter 4: StorEdge Inverter Connections
Installing the 9V Battery and Fuses
A 9V battery is supplied with the inverter accessories. Install the 9V battery in the holder on the top board 
of the StorEdge Connection Unit and connect it to the battery pad.
Figure 17: The battery holder
Two 25A fuses are supplied with the high power inverters. Install the fuses in the holders on the top board 
of the StorEdge Connection Unit .
Figure 18: StorEdge Connection Unit fuses