Configuring the RS485 Bus for Battery and Meter Connection
 4.  Select Meter 2. The meter configuration screen is displayed (SolarEdge meters are pre-configured to 
Device ID 2):
D e v i c e
P r o t o c o l
D e v i c e
C T
R a t i n g
S e c o n d a r y
V T
R a t i n g
S e c o n d a r y
M e t e r
M e t e r
T o p o l o g y
 5.  Configure the meter:
 a.  Select Device Type  Revenue Meter
 b.  Select Protocol  WattNode
 c.  Verify that Device ID is set to  2.
 d.  Set the CT value that appears on the CT label: CT Rating  <xxxxA>. 
If CT resets to 0, check the communication as described in step b of verify the connection:below.
 e.  For a meter installed at the grid connection point select Meter Func. Export+Import.
E x p o r t + I m p o r t
E x p o r t
C o n s u m p t i o n
P r o d u c t i o n
E x t .
I m p o r t
N o n e
 f.  The selected option is displayed in the RS485 Conf screen as <E+I>.
 g.  Select the grid Topology (WYE or Delta).
 6.  Select Communication RS485-1 Conf  Device Type  Multi Devices  Battery 1. The battery 
configuration screen is displayed:
D e v i c e
P r o t o c o l
D e v i c e
B a t t e r y
 7.  Select Device Type  Battery Pack.
 8.  Select the battery protocol and ID(s): 
Battery type
LG Chem RESU7/ RESU10
82
T y p e
< M T R >
< W N >
I D
< 2 >
< 0 >
C T
< 5 >
< 1 1 0 0 0 >
V T
< 1 1 0 >
F u n c .
< N o n e >
C o m m i s s i o n
< W y e >
P r o d u c t i o n
T y p e
< B A T >
< L G
B a t t e r y >
I D
< 1 5 >
I n f o
<
>
StorEdge Inverter Installation Guide MAN-01-00390-1.1
Protocol
Default Device ID
LG Battery
15