Chapter 3: Installing the Backed-up Loads
Panel and Meter
This chapter describes installation of the backed-up loads panel and a meter.

Installing the Backed-up Loads Panel

Install a secondary AC panel for backed-up loads (not supplied by SolarEdge). Rewire the backed-up 
 
loads through this panel. 
Install one pole 25A as the main circuit   b reaker.
 
Install a residual-current device (RCD) in accordance with the applicable local standards and directives
 
StorEdge Inverter Installation Guide MAN-01-00390-1.1

Chapter 3: Installing the Backed-up Loads Panel and Meter

Figure 13: Backed-up Loads Panel
25