Chapter 3: Installing the Backed-up Loads
Panel and Meter
This chapter describes installation of the backed-up loads panel and a meter.
Installing the Backed-up Loads Panel
Install a secondary AC panel for backed-up loads (not supplied by SolarEdge). Rewire the backed-up
loads through this panel.
Install one pole 25A as the main circuit b reaker.
Install a residual-current device (RCD) in accordance with the applicable local standards and directives
StorEdge Inverter Installation Guide MAN-01-00390-1.1
Chapter 3: Installing the Backed-up Loads Panel and Meter
Figure 13: Backed-up Loads Panel
25