Verifying the Connection

After connecting and configuring a communication option, perform the following steps to check that 
the connection to the monitoring server has been successfully established.
 1.  Close the inverter cover: Attach the inverter cover and secure it by tightening the screws with a 
torque of 9.0 N*m/ 6.6 lb.*ft. For proper sealing, first tighten the corner screws and then the two 
central screws. 
 2.  If not already ON - Turn ON the AC to the inverter by turning ON the circuit breaker on the main 
distribution panel and turning on the StorEdge Connection Unit (if applicable).
 3.  Wait for the inverter to connect to the SolarEdge monitoring platform. This may take up to two 
minutes.
A status screen similar to the following appears on the LCD panel:
V a c [ V ]
2 4 0 . 7
P _ O K :
0 0 0 / 0 0 0
- - - - - - - - - - - - - - -
S_OK: Indicates that the connection to the SolarEdge monitoring platform is successful. If S_OK is not 
displayed, refer to "Troubleshooting" on page 92.
StorEdge Inverter Installation Guide MAN-01-00390-1.1
Chapter 7: Setting Up Communication to the Monitoring Platform
V d c [ V ]
P a c [ w ]
1 4 . 1
0 . 0
< S _ O K >
O F F
79

Advertisement

Table of Contents
loading

Table of Contents