Chapter 4: Installing the Battery

Install the battery in accordance with the manufacturer instructions.
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
For easy access to battery connectors, it is recommended to connect the cables to
the battery and to set all battery DIP switches to their correct positions before
mounting the battery.
Measure the necessary length between the Connection Unit and the battery for all
cables. The maximum distance between the battery and the inverter is 70 ft/ 20 m,
when using 24 AWG/ 0.2 mm
Mark polarity on DC cables.
Mount the battery.
Connect all the wires to the battery connection panel.
Tie and wrap the cables to avoid pulling them out during mounting.
StorEdge Single Phase Inverter with HD-Wave Technology MAN-01-00627-1.1
2
cables for battery control.