Energy Meter Installation

Energy Meter Installation
The StorEdge solution requires connecting a meter   f or   S mart Energy Management applications, such as  
maximizing self-consumption. For backup power only, installing a meter is not required.
To install the SolarEdge meter, refer to the installation guide supplied with it: 
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide.pdf.
 
The meter is connected to the inverter using RS485.                
RS485 wiring specifications:
Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E STP) may be used)
 
Wire cross-section area: 0.2-1 mm²/ 24-18 AWG (a CAT5 cable may be used)
 
NOTE
The inverter RS485 bus should be connected to the battery and meter. Connecting
multiple inverters with RS485 master-slave connection may require an RS485 Plug-
in (available form SolarEdge; Refer to
expansion_kit_installation_guide.pdf).
For communication connection refer to Connecting Communication to the Meter on page 38.