SolarEdge StorEdge Installation Manual page 44

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Figure 29: Connection to grid and backed-up loads (StorEdge Connection Unit with glands)
To connect the AC cables - StorEdge Connection Unit with conduits:
NOTE
For Australia: Use 10mm
 1.  Insert the cable through the appropriate conduit opening:
For grid connection   ( from the main distribution panel) and for grounding: insert through the 
 
bottom opening labeled AC1 GRID
For backed-up loads connection   ( from a backed-up loads panel): insert through the side opening 
 
labeled BACKUP
 2.  Connect the grounding cable to the terminal block lableled 
 3.  Connect the AC wires according to the labels on the terminal blocks: Use a standard flat-blade 
screwdriver to connect the wires to the spring-clamp terminals:
 a.  Insert the screwdriver into the square opening at the top of the terminal block   a nd press to open 
clamp mechanism. 
 b.  Insert the wire into the round opening and release   t he screwdriver to spring back and clamp the 
wire.
Figure 30: Connection to grid and backed-up loads (StorEdge Connection Unit with conduits)
StorEdge Inverter Installation Guide MAN-01-00390-1.1
2
wire to connect the inverter to ground.
Chapter 4: StorEdge Inverter Connections
.
41

Advertisement

Table of Contents
loading

Table of Contents