Chapter 2: Installing The Power Optimisers; Safety - SolarEdge SE15K Installation Manual

Hide thumbs Also See for SE15K:
Table of Contents

Advertisement

Chapter 2: Installing the Power Optimisers

Safety

WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF/P
switch, the DC Disconnect Switch DC Safety Unit ON/OFF switch and the AC
circuit breaker on the main AC distribution panel.
CAUTION!
Power Optimisers are IP68/NEMA6P rated. Choose a mounting location where
optimisers will not be submerged in water.
CAUTION!
This unit must be operated according to the operating specifications provided
with the unit.
CAUTION!
Cutting the Power Optimiser input or output cable connector is prohibited and
will void the warranty.
CAUTION!
All PV modules must be connected to a Power Optimiser. 
CAUTION!
If you intend to mount the Power Optimisers directly to the module or module
frame, first consult the module manufacturer for guidance regarding the
mounting location and the impact, if any, on module warranty. Drilling holes in
the module frame should be done according to the module manufacturer
instructions.
IMPORTANT SAFETY FEATURE
Modules with SolarEdge Power Optimisers are safe. They carry only a low safety
voltage before the inverter is turned ON. As long as the Power Optimisers are
not connected to the inverter or the inverter is turned OFF, each Power
Optimiser will output a safe voltage of 1V.
Three Phase Inverter with SetApp Configuration
Chapter 2: Installing the Power Optimisers
    12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se17k

Table of Contents