IDEAL EVO S 50 Installation And Servicing page 72

Table of Contents

Advertisement

EVO S - Installation and Servicing
E. SPECIFIC START-UP PROCEDURE
"
"
Make the accessories' electrical connections.
"
"
Start up the boiler only.
"
"
Make the following settings:
• Configuration menu
Save the sensors
• Time and date menu
Set the time
Set the date
Set the year
• Configuration menu
Start up heating circuit 1
Configure the alarm output
Configure the direct circuit pump Q2
• Heating circuit 1 menu
For each circuit:
Adjust the comfort setting
Adjust the curve slope
Adjust the min. flow temperature for
heating circuit 1, if necessary
Removal of the over-value
• Switch the heating regime to permanent comfort
F. ELECTRICAL AND HYDRAULIC VALIDATION
• Inputs/outputs test menu
Check the outputs
Alarm relay
Direct circuit pump Q2
Reset the outputs
72 / 136
Diagrams: VF20, VF21, VF21bis
Line No.
Save sensors (6200)
Hours / minutes (1)
Day / month (2)
Year (3)
Heating circuit 1 (5710)
Relay output QX1 (5890)
Relay output QX2 (5891)
Comfort setpoint (710)
Heating curve slope (720)
Flow temp setpoint min (740)
Mixing valve boost (830)
Relay test (7700)
Relay test (7700)
Relay test (7700)
00RNO0333-B (U0625869)
page 4 / 5
Value
Yes (switches back
to no automatically)
HH.MM
DD.MM
YYYY
On
Alarm output K10
Heat circuit pump
HC1 Q2
- - -
- - -
in °C
0 °C
Relay output QX1
Relay output QX3
No test

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evo s 70Evo s 95Evo s 115Evo s 135

Table of Contents