IDEAL EVO S 50 Installation And Servicing page 103

Table of Contents

Advertisement

DHW optimisation:
• DHW tank menu
Adjust the over value
Maintenance optimisation
A maintenance message may be generated that does not set the boiler to fault. This maintenance
message may be displayed after the following 3 counters have expired:
• Time since last maintenance (or commissioning): set parameter 7044 to 12 months.
• Operating hours of the burner (parameter 7040).
• Number of starts (parameter 7042)
These last 2 parameters are dependent on the boiler's hydraulic installation. We recommend
using at least parameter 7044 for annual maintenance.
27.08.2018
Diagram: VF11
EVO S - Installation and Servicing
Flow setpoint boost (5020)
page 9 / 9
16 °C
103 / 136

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evo s 70Evo s 95Evo s 115Evo s 135

Table of Contents