Removing / Installing The Front Panels; Exhaust Connection - IDEAL EVO S 50 Installation And Servicing

Table of Contents

Advertisement

EVO S - Installation and Servicing

4.2. Removing / installing the front panels

figure 6 - Removing the trim doors

4.3. Exhaust connection

IMPORTANT:
20 / 136
U0561516-#
You must comply with the regulatory texts and rules of the art that apply in
the country where the boiler will be installed.
The exhaust extraction ducts must be made in a material resistant to the
condensate that can form when the boiler is operating. These materials
must also be capable of supporting flue gas temperatures up to 120°C.
One exhaust temperature sensor guarantees the protection of the type
B and C combustion product evacuation ducts.
EVO S boilers are approved to be connected to:
• a B23 or B23P flue
• a C13 or C33 suction pipe
The boiler must not be made to support the exhaust duct's weight.
Pull the bottom of the panel forwards to release.
Pull the top of the panel forwards to release.
Remove the panel.
Do the opposite to install the panel.
00RNO0333-B (U0625869)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evo s 70Evo s 95Evo s 115Evo s 135

Table of Contents