IDEAL EVO S 50 Installation And Servicing page 64

Table of Contents

Advertisement

EVO S - Installation and Servicing
E. SPECIFIC START-UP PROCEDURE
Make the accessories' electrical connections.
IMPORTANT:
"
"
Start up the boiler only.
"
"
Carry out the adjustments below.
On EVO S boiler:
• Time and date menu
Set the time
Set the date
Set the year
• Configuration menu
Start up heating circuit 1
Start up heating circuit 2
Configure the alarme report
Configure DHW pump
If the boiler pump is supplied by
customer
Configure the extension modules
• LPB network menu
Device number
Segment number
Configure the bus supply
Set the clock program
• Heating circuit 1 / 2
Adjust the comfort setting
Adjust the curve slope
64 / 136
Diagram: VF4
Configure the switches on the AGU 2.550 extension modules.
Function extension module 1 (6020)
Function extension module 2 (6021)
Bus power supply function (6604)
Heating curve slope (720/1020)
Line No.
Hours / minutes (1)
Day / month (2)
Year (3)
Heating circuit 1 (5710)
Heating circuit 2 (5715)
Relay output QX1 (5890)
Relay output QX2 (5891)
Relay output QX3 (5892)
Device address (6600)
Segment address (6601)
Clock mode (6640)
Comfort setpoint (710/1010)
00RNO0333-B (U0625869)
page 4 / 8
Value
HH.MM
DD.MM
YYYY
On
On
Alarm output K10
DHW ctrl elem Q3
Boiler pump Q1
Heat circuit 1
Heat circuit 2
1
0
Automatically
Master
- - -
- - -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evo s 70Evo s 95Evo s 115Evo s 135

Table of Contents