Assembly Of Vertical Manifolds - Carrier Aero 39MN Series Installation, Start-Up And Service Instructions Manual

39mn,mw03-110 series indoor and weathertight outdoor air handlers
Table of Contents

Advertisement

SIZE
SAKT**15*0
SAKT**20*0
SAKT**25*0
SAKT**32*0
SAKT**40*0
SAKT**44*0
SAKT**50*0
SAKT**65*0
SAKT**84*0
NOTE: Bottom feed humidifier shown with
field-supplied and installed control valve.
Sizes 03-14 are bottom fed. Sizes 17-61
are top feed.
Fig. 83 — Control Valve, Strainer and Trap Connected to Supply and Manifold of Humidifier
Assembly of Vertical Manifolds —
distribution manifolds are inserted into the bottom feed header
by hand (slip fit) and then into the top header if any. See
Fig. 84.
• Vertical slotted discharge manifolds must be installed
with the internal fishbone wick ends sloping up as in a
"Y."
• Do not force the vertical manifolds into the headers
beyond the insulation.
• Do not use any lubricants. Manually reform the ends
slightly if necessary.
• Ensure discharge slots are perpendicular to the air flow.
• On top fed 17-61 sizes, run a bead of RTV silicone caulk
around the junction of the vertical manifolds and top
header.
Table 33 — Carel Inlet Trap Strainer Kits
MATERIAL, TYPE, REGION CODE
****FT**O*
Flange DN 15
Flange DN 20
Flange DN 25
Flange DN 32
Flange DN 40
Not available
Flange DN 50
Flange DN 65
Not available
The
vertical
****FT**U*
Not available
Not available
Not available
Not available
Not available
1 in. NPT female
Not available
Not available
2 in. NPT female
Fig. 84 — Vertical Manifold
120
****ST**U*
Not available
Not available
Not available
Not available
Not available
1 in. NPT female
Not available
Not available
2 in. NPT female
a39-4413
a39-4412

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents