Carrier Aero 39MN Series Installation, Start-Up And Service Instructions Manual page 247

39mn,mw03-110 series indoor and weathertight outdoor air handlers
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
Once start-up is complete, send a completed copy of this checklist to the applicable
Sales Engineer and Post Sale Product Marketing at 39MW@carrier.utc.com
I. PRELIMINARY INFORMATION
MODEL NO.JOB NAME ________________________
SERIAL NO. ADDRESS ________________________
START-UP DATE _____________________________
TECHNICIAN NAME ___________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
CONTROLS
Are control(s) and indoor fan control wiring connections made and checked?
Are all wiring terminals tight? (including power to fan motors, heaters, etc.)(Pg 137)
AIR HANDLER
Remove packaging and any construction debris.
Inspect for shipping and/or handling damage, make claims as required. (Pg 83)
Inspect all panel flanges for damage. Panel flanges should be smooth with no sharp bends.
Are all corner connectors and frame to channel joints smooth with no cracks, large bumps
or depressions in the caulk?
Are any door latches loose or damaged? If so, tighten or replace
AT EACH SECTION JOINT,
VERIFY:
IS ROOF SLIDER INSTALLED
ON TOP OF ROOF?
IS END ROOF BRACKET
MOUNTED AND GASKETED TO
EACH SIDE OF ROOF JOINT?
ARE BASE RAILS BOLTED ON
BOTH SIDES?
ARE UPPER SIDE TOP
BRACKETS UNDER ROOF
BOLTED AND TIGHTENED?
ARE BOTH SECTION TO
SECTION JOINTS UNIFORMLY
GASKETED?
IS GASKET COMPRESSED AND
A SECTION-TO-SECTION SPLIT
CAULKED ALONG ENTIRE
LENGTH OF SEAM?
IF CCH ATTACHED, VERIFY
CCH TO UNIT SEALS:
IS ROOF BRACKET SLIDER
INSTALLED ON TOP OF ROOF?
ARE SIDE FLASHINGS
INSTALLED ON BOTH SIDES?
IS CCH TO UNIT BASE JOINT
CAULKED PER
INSTRUCTIONS?
START-UP CHECKLIST — 39MW OUTDOOR AHU UNITS
JOINT 1
(PG 88)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 85)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 85-86) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 88)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 85)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
CCH 1
(PG 113)
(Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 112)
(Y/N) _____ (Y/N) _____ (Y/N) _____
(PG 113)
(Y/N) _____ (Y/N) _____ (Y/N) _____
JOINT 2
JOINT 3
CCH 2
CCH 3
CL-3
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
JOINT 4
JOINT 5
JOINT 6