Fig. 5 - Vertical transport using a lifting beam
NOTE: For hoisting please ensure that the weight is evenly
distributed.

1.5 - Horizontal transport

For horizontal movement pallet lifters or transport skids can be
placed under the installation frame or under the lifting bars. It is
important that these support the lifting points. At no time should
the cross beams at the ends of the unit sections be used for jack-
ing or tracking the AHU. FOR HORIZONTAL TRANSPORT
ALWAYS PROVIDE SUPPORT UNDER THE LIFTING
POINTS. The use of pipes as rollers can result in damage to the
installation frame.
Fig. 6 - Horizontal transport using rollers

2 - PREPARATION FOR ASSEMBLY

The following material is supplied as standard by Carrier
Holland Heating:
Installation, maintenance and operating instructions

Lifting instructions

II A declaration
Kit
Connecting bolts/screws
Connecting strips/screws
Lifting bars
The following material is supplied as an option by Carrier
Holland Heating:
Siphon
Anti-vibration mats
Outside air suction grille
4
Heat recovery wheel control
Steam generator plus accessories
Minihelic and Allen key instructions
Door key
Check that all necessary parts are supplied with the AHU.
Measure the location and make sure it is tidy. The fl oor of the
installation area should be level and fl at to avoid connection
problems. Any uneven surfaces should be evened out with infi ll
plates.
Determine the correct assembly sequence of the AHU sections.
Use the most logical sequence, taking the location into account.
Begin with the casing section that must be positioned on the
highest part of the fl oor, so that the other casing sections can be
added around it.
3. LIFTING INSTRUCTIONS

3.1 - General

There are transport and lifting instructions attached to the AHU.
3.2 - Lifting bar certifi cation
The lifting bars supplied are for single use and certifi ed in
accordance with Machinery Directive 98/37/EC, annex II-A.
Selection, checking and testing of the lifting bars is supervised
by a qualifi ed person in accordance with the EKH ("Erkende
Keurbedrijven Hijs- en Hefmiddelen") work instructions.
Registration mark and number:
LCH1 + 1A
LCH2 + 2A

3.3 - Fastening of the lifting bars

Remove the bolt and the locking plate on one side of the
lifting pipe.
Fig. 7 - Fastening the lifting bars - 1
Slide the lifting bar into the hole in the subframe intended
for that purpose.