Prerequisites - Dell EMC Z9264F-ON Installation Manual

Hide thumbs Also See for Z9264F-ON:
Table of Contents

Advertisement

LED
Table 4. QSFP28 port LEDs
LED
Link/Activity LED—100G, 40G, or 10G
Link/Activity LED—4x25G mode or 4x10G mode
Link/Activity LED—2x50G mode

Prerequisites

The following is a list of components that are required and optional for successful switch installation:
NOTE:
For detailed installation instructions, see
Z9264F-ON switch or multiple switches, if stacking
AC or DC country- and regional-specific cables to connect the AC or DC power source to each of the AC or DC power supplies
Rail mounting brackets for rack installation, included
M4 screws for rack installation
#1 and #2 Phillips screwdrivers, not included
Torx screwdriver, not included
Ground cable screws for L-bracket, included
Copper/fiber cables
Other optional components are:
M4 ground cable screw
Extra power supply unit
Extra fan module
NOTE:
The DC ground lug kit ships with the other accessories inside the shipping box.
Description
Flashing green—port activity
Description
Off—No link
Solid green—Link operating at maximum speed, 100G for
QSFP28 port
Flashing green—Port activity operating at maximum speed,
100G for QSFP28 ports
Solid yellow—Port activity operating at a lower speed, 40G or
10G port
Flashing yellow, 1 second on/off—Port beacon
Off—No link
Solid green—Link operating at maximum speed, 4x25G port
Flashing green—Link activity operating at maximum speed,
4x25G port
Solid yellow—Link operating at a lowr speed, 4x10G port
Flashing yellow, 1 second on/off—Port beacon
Off—No link
Solid yellow—Link operating at a lower speed, 2x50G port
Flashing yellow—Port activity at a lower speed, 2x50G port
Flashing yellow, 1 second on/off—Port beacon
Site preparations
and
Z9264F-ON switch
installation.
Z9264F-ON switch
11

Advertisement

Table of Contents
loading

Table of Contents