Optics Removal; Switch Start-Up; Start Up Sequence; Switch Replacement - Dell EMC Z9264F-ON Installation Manual

Hide thumbs Also See for Z9264F-ON:
Table of Contents

Advertisement

Optics removal

Remove an optic by pushing the tab on the optic and sliding the optic from the port.
When removing optics with direct attach cables (DACs) from the port, pull the release tab firmly and steadily. Before pulling the release tab,
you may need to gently push the optic into the port to ensure that it is seated properly. Do not jerk or tug repeatedly on the tab.

Switch start-up

Supply power to the Z9264F-ON switch after it is mounted in a rack or cabinet.
Dell EMC recommends reinspecting your switch before starting it up. Verify the following:
Optional: The equipment is properly secured to the rack and properly grounded.
Optional: The equipment rack is properly mounted and grounded.
The ambient temperature around the unit, which may be higher than the room temperature, is within the limits that are specified for the
Z9264F-ON switch. For more information, see Specifications.
There is sufficient airflow around the unit.
The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
All protective covers are in place.
CAUTION:
Do not start up the switch if you did not install a fan module.
NOTE:
A US AC or DC power cable is included for powering up an AC or DC power supply. You must order all other power cables
separately.
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the Z9264F-ON switch and components.

Start up sequence

When the switch starts up, the fans immediately come on at high speed. The fan speed slows as the switch continues to boot up.

Switch replacement

The following steps describe removing and replacing a switch. For further assistance when replacing a switch, contact your Dell EMC
support representative.
NOTE:
ESD damage can occur when components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and accessories. After you remove the original packaging, place the switch and components on an
anti-static surface.
1
Back up the switch configuration to your back-up computer or laptop TFTP server.
copy running-config tftp://hostip/filepath
To establish a console connection to the switch CLI, assign an IP address on the switch network.
2
Disconnect the power source.
3
Label and remove all cables.
4
Remove the switch from the rack.
At the same time, press in the two side-release bars on the switch and slide the switch forward.
If you are using the fan trays or PSUs in the replacement switch, remove them from the switch.
5
Unpack the new switch.
26
Z9264F-ON switch installation

Advertisement

Table of Contents
loading

Table of Contents