Install The Stiletto Control (Stiletto Family Masts Only); Figure 2-23 Stiletto Control To Db9 Terminal Block - Will Burt D-Tect 5354901 Operator's Manual

Sensor shown, rack mount display shown, wall mount display shown
Table of Contents

Advertisement

'
D-TEC O
M
PERATOR
S

2.6.2.9 Install the Stiletto Control (Stiletto Family Masts Only)

Using the D-TEC with a Stiletto requires connecting the D-TEC into the Stiletto Control. The
operator should use a customer-supplied 2-conductor 20 AWG cable for installation.
To connect the D-TEC to the Stiletto Control (Figure 2-23):
1. Wire from Stiletto Control J4-D (Remote Up) to the DB9 Terminal Block where the
orange wire from DB9 connects.
2. Wire from Stiletto Control J4-E (Remote Down) to the DB9 Terminal Block where the
yellow wire from DB9 connects.
Note: It is important that the D-TEC must use the same power source as the Stiletto. See
Section 2.6.2.12 for details on installing system power.
2-26
ANUAL

Figure 2-23 Stiletto Control to DB9 Terminal Block

TP-5522901-00
July 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-tect 5354701D-tect 5354801

Table of Contents