2.6.2.3 Install Override/Clear Switch

The Override/Clear Switch (P/N: 000016-300-101) is a momentary push button switch which
mounts inside the Mounting Base (P/N: 000016-901-101) and is used to clear and override
alarms. The operator should use a customer-supplied 2-conductor 20 AWG cable for
installation.
To install the Override/Clear Switch (Figure 2-14):
1. Install the Override/Clear Switch keeping in mind that:
The Override/Clear Switch will need to be installed near the Up/Down Switch so
that the same operator may use both switches.
The Keylock Switch will need to be installed at least six feet (183 cm) or greater
from the Override/Clear Switch so that it is impossible for one person to operate
both simultaneously. The distance should force a two-person override.
All switches need to allow the top of the mast to always be visible to the operator
while engaged.
2. Secure the:
a. Override/Clear input cable from the Override/Clear Switch to the DB25 Terminal
Block where the white wire from DB25-16 connects.
b. Common cable from the Override/Clear Switch to the DB25 Terminal Block
where the green wire from DB25-3 connects.
TP-5522901-00
July 2018

Figure 2-14 Install the Override/Clear Switch

'