CHAPTER 4 - BOILER PIPING

4.1.

General Piping Requirements

All plumbing must meet or exceed all local, state
and national plumbing codes.
Support all piping using hangers. DO NOT support
piping by the unit or its components.
Use isolation valves to isolate system components.
Install unions for easy removal of the PRESTIGE Ex-
cellence from the system piping.
If nonmetallic pipe is used in the system, it must
have a maximum oxygen diffusion rate of 0.1 mg/
liter per day.
WARNING
Use a two-wrench method when tightening
field piping onto the boiler piping connections.
Use one wrench to prevent the boiler connec-
tions from turning and the second to tighten
field piping. Failure to support the boiler pip-
ing connections could damage piping, causing
a leak, resulting in substantial property dam-
age, serious injury, or death.
Drain Piping Directed
Place of Drainage

Pressure Relief Valve

(Supplied with Boiler)
to a Suitable

Fig. 5 - Pressure Relief Valve Installation

4.2.
Pressure Relief Valve
1. The PRESTIGE Excellence is supplied with a 30 psi
pressure relief valve and must be piped using the
PRV connection as shown in Fig. 5 below.
2. To avoid potential water damage to the surround-
ing area or potential scalding hazard due to the op-
eration of the relief valve, the discharge piping:
Must be connected to the discharge outlet of the
relief valve and directed to a safe place of disposal.
Length should be as short and direct as possible. The
size of the discharge line must not be reduced, main-
tain the same size as the outlet of the relief valve.
Must be directed downward towards the floor
at all times. The piping should terminate at
least 6 inches [153 mm] above any drain con-
nection to allow clear visibility of the discharge.
Must terminate with a plain end, not with a threaded
end. The material of the piping must have a service-
able temperature rating of 250ºF or greater.
Must not be subject to conditions where freez-
ing could occur.
Must not contain any shut-off valves or ob-
structions. No shut-off valve should be piped
between the boiler and relief valve.
WARNING
Failure to comply with the guidelines on
installing the pressure relief valve and dis-
charge piping can result in substantial prop-
erty damage, serious injury, or death.