Sign In
Upload
Manuals
Brands
TriangleTube Manuals
Boiler
Prestige Solo 110
TriangleTube Prestige Solo 110 Manuals
Manuals and User Guides for TriangleTube Prestige Solo 110. We have
7
TriangleTube Prestige Solo 110 manuals available for free PDF download: Installation & Maintenance Manual, Installation And Maintenance Manual, Manual, Instructions
TriangleTube Prestige Solo 110 Installation & Maintenance Manual (120 pages)
Brand:
TriangleTube
| Category:
Boiler
| Size: 6 MB
Table of Contents
Table of Contents
3
Product and Safety Information
11
Chapter 1 - Pre-Installation Requirements
13
INSTINCT Boilers - Code Compliance
13
Code Restrictions
13
Operating Restrictions
13
Determining Product Location
14
Boiler Freeze Protection Feature
14
Boiler Replacement
14
Recommended Clearances
15
Residential Garage Installations
15
Chapter 2 - Combustion Air & Venting
17
Combustion Air Contamination
17
Ventilation and Combustion Air Requirements - Direct Vent
18
Ventilation and Combustion Air Requirements - Category IV
18
Methods of Accessing Combustion Air into a Space - Category IV
19
Indoor Combustion Air
19
Outdoor Combustion Air
19
Fig. 1 - All Combustion Air from Adjacent Indoor Spaces through Indoor Combustion Openings
19
Fig. 2 -All Combustion Air from Outdoors through One Permanent Air Opening
19
Combination of Indoor and Outdoor Combustion Air
20
Combustion Air and Vent Piping
20
Fig. 3 - All Combustion Air from Outdoors through Ventilated Attic
20
Fig. 4 - All Combustion Air from Outdoors through Horizontal Ducts
20
Removal of an Existing Boiler from a Common Vent System
21
Carbon Monoxide Detector Installation
22
Commonwealth of Massachusetts Installation Requirements
22
Installation of Carbon Monoxide Detectors
22
Approved Carbon Monoxide Detectors
22
Signage
23
Inspection
23
Manufacturer Requirements - Gas Equipment Venting System Provided
23
Manufacturer Requirements - Gas Equipment Venting System Not Provided
23
Chapter 3 - Unit Preparations
25
Handling Instructions
25
Wall Mounting Installation
25
Accessories
25
Fig. 5 - Accessories
25
Wall Mounting Guidelines
26
Stud Walls - Installation
26
Wall Bracket Installation - Solid Walls
26
Boiler Mounting
26
Front Panel Removal
26
General Piping Requirements
27
Pressure Relief Valve
27
Fig. 6 - INSTINCT Pressure Relief Valve, Drain Valve, T&P Gauge Installation
27
Boiler Air Vent
28
Low Water Cutoff Device
28
Fig. 7 - Piping Component Legend
28
Additional Limit Control
29
Backflow Preventer
29
INSTINCT solo Boiler System Piping
29
Fig. 8 - INSTINCT solo Near Boiler Piping - Hydraulic Separator
29
Expansion Tank and Makeup Water
30
Diaphragm Expansion Tank
30
Closed-Type Expansion Tank
30
Circulator
30
Fig. 9 - INSTINCT solo Near Boiler Piping - Closely Spaced Tees
30
Sizing Primary Piping
31
Domestic Hot Water System Piping
31
System Piping - Zone Circulators
31
System Piping - Zone Valves
31
System Piping - through Boiler
31
System Piping - Radiant Heating
31
System Piping - Special Application
32
System Piping - Multiple Units Installation
32
INSTINCT Combi Boiler System Piping
32
Fig. 10 - INSTINCT Combi Near Boiler Piping - Hydraulic Separator
32
Expansion Tank and Makeup Water
33
Diaphragm Expansion Tank
33
Circulator
33
Fig. 11 - INSTINCT Combi Near Boiler Piping - Timesaver Manifold
33
Sizing Primary Piping
34
System Piping - Zone Circulators
34
System Piping - Zone Valves
34
System Piping - through Boiler
34
System Piping - Radiant Heating
34
System Piping - Special Application
34
Optional System Piping and Cascading
34
Chapter 5 - Instinct Combi Units - Domestic Piping
35
Domestic Piping Pressure Relief Valve
35
Standard Installation
35
Pressure Relief Valve - Standard Installations
35
Pressure Relief Valve Discharge Piping
35
Fig. 12 - Standard Installation of the Domestic Pressure Relief Valve
35
Thermal Expansion
36
Fig. 13 - INSTINCT Combi - Hydro-Block Flow Diagram
36
Water Hammer
37
Vacuum Breaker
37
Hydro-Block
37
General Piping
37
Thermostatic Mixing Valve
37
Chapter 6 - Installing Vent/Combustion Air & Condensate Drain
39
Installing Vent and Combustion Air
39
Installing Condensate Drain Assembly into INSTINCT solo Units
39
Fig. 14 - Condensate Drain Assembly
40
Chapter 7 - Gas Piping
41
Gas Supply Piping Connection
41
Fig. 15 - Recommended Gas Supply Piping
41
Natural Gas
42
Pipe Sizing
42
Supply Pressure Requirements
42
Propane Gas
43
Pipe Sizing
43
Supply Pressure Requirements
43
Fig. 16 - Gas Valve / Venturi Assembly - INSTINCT solo 110
44
Fig. 17 - Gas Valve / Venturi Assembly - INSTINCT Solo/Combi 155
44
Fig. 18 - Gas Valve / Venturi Assembly - INSTINCT Solo/Combi 199
45
Chapter 8 - Wiring
47
Internal Wiring
47
General Requirements
47
Fuse Locations
47
Fig. 19 - Ctrlmax Control Module Fuse Location
47
Fig. 20 - Multiple Zones - Panel Wiring with Circulators
48
Fig. 21 - INSTINCT Combi System Piping - Multiple Zones - Panel Wiring with Valves
49
Fig. 22 - INSTINCT solo Boiler Factory Wiring
50
Fig. 23 - INSTINCT Combi Boiler Factory Wiring
51
External Wiring
52
General Requirements
52
Line Voltage Connections
52
External Wiring - INSTINCT solo Units
52
Circulator Wiring
52
Fig. 24 - Terminal Strip Location
52
Low Voltage Connections
53
Thermostat Wiring
53
Outdoor Sensor Wiring
53
Domestic Hot Water Wiring
53
Additional Boiler Limits
53
Fig. 25 - Low Voltage Connections
53
External Modulation Control
54
System Sensor Wiring
54
Cascade Wiring - Optional
54
Modbus
54
Chapter 9 - Ctrlmax Operation
55
Ctrlmax Navigation
55
Fig. 26 - Ctrlmax User Interface
55
Ctrlmax Menu Structure
56
Home Screen
57
Status Line Messages
58
Main Menu
59
EZ Setup
59
Heating EZ Setup
60
Select CH Demand (no Outdoor Sensor Connected)
60
Select CH Demand(Outdoorsensorconnected)
61
Domestic Hot Water EZ Setup - INSTINCT solo Units
62
Domestic Hot Water EZ Setup - INSTINCT Combi Units
63
Altitude Setup
63
EZ Setup Reset
64
Display EZ Setup
64
DHW Operation
65
Boiler Information
65
Information Items
66
Lockout Screen
67
Manual Reset Lockouts
68
Automatic Reset Blocking Lockouts
69
Chapter 10 - Start-Up Preparation
71
Boiler System Fluid Requirements
71
Boiler Fluid Ph Level 6.0 to 8.0
71
Boiler Fluid Hardness Less than 7 Grains
71
Chlorinated Water
71
Flush Boiler to Remove Sediment
71
Cleaning of Old Boiler/System
71
Cleaning of New Boiler/System
71
Check and Test Antifreeze
72
Use of Antifreeze in the Boiler System
72
Filling the Boiler System
73
INSTINCT Combi Water Heater - Water Requirements
73
Filling the Domestic Circuit
73
Check Low Water Cut-Off Device
73
Check for Gas Leaks
74
Check Thermostat Circuit
74
Inspect Condensate Drain Assembly
74
Chapter 11 - Start-Up Procedures
75
Final Checks before Start-Up
75
INSTINCT Start-Up
75
Check the INSTINCT and System
75
Check Boiler Piping
75
Check Vent and Combustion Air Piping
75
Check Gas Piping
75
Verify Flame Pattern and Combustion
77
Fig. 27 - Throttle Screw Location
77
Measure Input - Natural Gas Only
78
Test High Temperature Limit
78
Chapter 12 - Outdoor Reset Control
79
Mounting the Outdoor Sensor
79
Wiring the Sensor
79
Chapter 13 - External Modulating Control
81
Wiring the Modulating Controller
81
Ctrlmax Programming
81
Programming of External Modulating Control
81
Chapter 14 - Check-Out Procedures
83
Chapter 15 - Installation Record
85
Chapter 16 - Maintenance Schedules
87
Service Technician
87
Owner Maintenance
87
Chapter 17 - Maintenance Procedures
89
Servicetechnician Maintenance Procedures
89
Reported Problems
89
Check Surrounding Area
89
Inspect Burner Area
89
Check System Piping
89
Clean Condensate Drain Assembly
89
Check Ventilation Air Openings
90
Inspect Vent and Combustion Air Piping
90
Check Boiler System
90
Check Expansion Tank
90
Check Boiler Relief Valve
90
Inspection of Ignitor
90
Check Ignition Cable and Ground Wiring
91
Check Control Wiring
91
Check Control Settings
91
Perform Start-Up and Checkout Procedures
91
Check Burner Flame
91
Check Flame Signal
91
Check Combustion Levels
92
Check Flue Gas Temperature
92
Clean Heat Exchanger
92
Check Carbon Monoxide Detectors
92
Review with Owner
92
Torque Specifications Table
92
Chapter 18 - Replacement Parts
93
Fig. 28 - INSTINCT solo Jacket Components
93
Fig. 29 - INSTINCT Combi Jacket Components
94
Fig. 30 - INSTINCT solo 110 Internal Components
95
Fig. 31 - INSTINCT solo 155 Internal Components
96
Fig. 32 - INSTINCT Combi 155 Internal Components
97
Fig. 33 - INSTINCT solo 199 Internal Components
98
Fig. 34 - INSTINCT Combi 199 Internal Components
99
Fig. 35 - INSTINCT solo 110 Burner Components
100
Fig. 36 - INSTINCT Solo/Combi 155 Burner Components
101
Fig. 37 - INSTINCT Combi 199 Burner Components
102
Fig. 38 - INSTINCT Control & Display Enclosures
103
Fig. 39 - INSTINCT Combi Hydro-Block
104
Chapter 19 - Product Specifications
105
Fig. 40 - Front View INSTINCT solo 110
106
Fig. 41 - Right Side View INSTINCT solo 110
107
Fig. 42 - Front View INSTINCT solo 155
108
Fig. 43 - Right Side View INSTINCT solo 155
109
Fig. 44 - Front View INSTINCT solo 199
110
Fig. 45 - Right Side View INSTINCT solo 199
111
Fig. 46 - Front View INSTINCT Combi 155
112
Fig. 47 - Right Side View INSTINCT Combi 155
113
Fig. 48 - Front View INSTINCT Combi 199
114
Fig. 49 - Right Side View INSTINCT Combi 199
115
Graph 1 - INSTINCT solo - Pressure Loss through Boiler
116
Graph 2 - INSTINCT Combi - Pressure Loss through Boiler
116
Advertisement
TriangleTube Prestige Solo 110 Installation & Maintenance Manual (100 pages)
prestige
Brand:
TriangleTube
| Category:
Boiler
| Size: 7 MB
Table of Contents
Table of Contents
2
Product and Safety Information
7
Definitions
7
Product and Safety Information
8
Section I - Pre-Installation Items
9
Code Compliance
9
Determining Product Location
9
Boiler Replacement
9
Recommended Clearances
9
Residential Garage Installations
10
Boiler Freeze Protection Feature
10
Section II - Combustion Air and Venting
11
Combustion Air Contamination
11
Ventilation and Combustion Air Requirements - Direct Vent
12
Ventilation and Combustion Air Requirements - Category IV
12
Methods of Accessing Combustion Air into a Space - Category IV
13
Indoor Combustion Air
13
Outdoor Combustion Air
13
Combination of Indoor and Outdoor Combustion Air
15
Combustion Air and Vent Piping
15
Removal of an Existing Boiler from a Common Vent System
16
Commonwealth of Massachusetts Installation
17
Section III - Unit Preparations
18
Handling Instructions
18
Wall Mounting Installation
18
Wall Mounting Guidelines
18
Wall Bracket Installation - Stud Walls
19
Wall Bracket Installation - Solid Walls
19
Boiler Mounting
19
Section IV - Boiler Piping
20
General Piping Requirements
20
Pressure Relief Valve
20
Low Water Cutoff Device
20
Boiler Piping
21
Additional Limit Control
22
Backflow Preventer
22
Boiler System Piping Applications
22
Expansion Tank and Makeup Water
22
Diaphragm Expansion Tank
23
Closed-Type Expansion Tank
23
Circulator
23
Sizing Primary Piping
23
Domestic Hot Water System Piping
23
System Piping - Zone Circulators
23
System Piping - Zone Valves
23
Piping Component Legend
24
Near Boiler Piping Diagrams
25
System Piping - through Boiler
26
System Piping - Radiant Heating
26
System Piping - Special Applications
26
System Piping - Multiple Units Installation
26
System Piping Diagrams
27
Section V - Installing Vent / Combustion Air & Condensate Drain
30
Installing Vent and Combustion Air
30
Installing Condensate Drain Assembly
30
Section VI - Gas Piping
32
Gas Supply Piping Connection
32
Natural Gas
33
Pipe Sizing -Natural Gas
33
Natural Gas Supply Pressure Requirements
33
Propane Gas
34
Pipe Sizing - Propane Gas
34
Propane Gas Supply Pressure Requirements
34
Gas Valve/Venturi Assembly
35
Section VII - Internal Wiring
36
General Requirements
36
Internal Factory Wiring Diagram
37
Section VIII - External Wiring
38
Installation Compliance
38
Line Voltage Connections
38
Circulator Wiring
38
Alarm Wiring
39
Low Voltage Connections
39
Thermostat Wiring
39
Outdoor Sensor Wiring
40
Domestic Hot Water Wiring
40
Additional Boiler Limits
40
External Modulation Control
40
System Sensor Wiring
40
Cascade Wiring
41
Modbus Wiring
41
Zone Valve Wiring
42
External Wiring
42
Zone Circulator Wiring
43
System Piping Wiring Diagrams
44
Section IX - Trimax Operation
46
Trimax User Interface
46
Trimax Navigation
47
Trimax Menu Structure
48
Home Screen
49
Status Line Messages
50
Main Menu
51
EZ Setup Menu
52
Heating EZ Setup
52
Domestic Hot Water EZ Setup
54
EZ Setup Reset
55
Display EZ Setup
55
CH/DHW Operation
56
Boiler Information
56
Information Items
57
Lockout History
58
Lockout Screen
59
Manual Reset Hard Lockouts
60
Automatic Reset Soft Lockouts
61
Section X - Start-Up Preparation
62
Check Boiler System Water Chemistry
62
Water Ph Level 6.0 to 8.0
62
Water Hardness Less than 7 Grains
62
Chlorinated Water
62
Flush Boiler System and Domestic System to Remove Sediment
62
Check and Test Antifreeze
62
Use of Antifreeze in the Boiler System
63
Filling the Boiler System
63
Check Low Water Cut-Off Device
63
Check for Gas Leaks
64
Check Thermostat Circuit
64
Inspection of Condensate Drain Assembly
64
Section XI- Start-Up Procedures
65
Final Checks before Start-Up
65
PRESTIGE solo Start-Up
65
If PRESTIGE solo Does Not Start Correctly
65
Check the PRESTIGE solo and System
65
Operating Instructions
68
Section XII - Outdoor Reset Control
69
Mounting the Outdoor Sensor
69
Wiring the Sensor
69
Section XIII - External Modulating Control
70
Wiring the Modulating Controller
70
Trimax Adjustment
70
Programming of External Modulating Control
70
Factory Trimax Settings
71
External Modulating Control
71
Section XIV - Check-Out Procedures
72
Check-Out Procedures
72
Section XV - Installation Record
73
Installation Record
73
Sections XVI - Maintenance Schedule
74
Service Technician - General
74
Owner Maintenance
74
SECTION XVII- Maintenance Procedures
75
Maintenance Procedures
75
Reported Problems
75
Check Surrounding Area
75
Inspect Burner Area
75
Check System Piping
75
Clean Condensate Drain Assembly
76
Check Ventilation Air Openings
76
Inspect Vent and Combustion Air Piping
76
Check Boiler System
76
Check Expansion Tank
77
Check Boiler Relief Valve
77
Inspection of Ignition Electrode
77
Check Ignition Wiring and Ground Wiring
77
Check Control Wiring
78
Check Control Settings
78
Perform Start-Up and Checkout Procedure
78
Check Burner Flame
78
Check Flame Signal
79
Check Combustion Levels
79
Check Flue Gas Temperature
79
Clean Heat Exchanger
79
Review with Owner
80
Handling Previously Fired Combustion Chamber Insulation
80
Replacement Parts
81
Replacement Parts
89
Product Specifications
90
Specifications
91
TriangleTube Prestige Solo 110 Installation And Maintenance Manual (76 pages)
Brand:
TriangleTube
| Category:
Boiler
| Size: 4 MB
Table of Contents
For Your Safety
1
Table of Contents
2
Product and Safety Information
7
Definitions
7
Section I - Pre-Installation Items
9
Code Compliance
9
Determining Product Location
9
Boiler Replacement
9
Recommended Clearances
10
Residential Garage Installations
10
Boiler Freeze Protection Feature
10
Section II - Combustion Air and Venting
11
Combustion Air Contamination
11
Ventilation and Combustion Air Requirements - Direct Vent
12
Ventilation and Combustion Air Requirements - Category IV
12
Methods of Accessing Combustion Air into a Space - Category IV
13
Indoor Combustion Air
13
Outdoor Combustion Air
13
Combination of Indoor and Outdoor Combustion Air
14
Combustion Air and Vent Piping
15
Removal of an Existing Boiler from a Common Vent System
16
Commonwealth of Massachusetts Installation
17
Section III - Unit Preparations
18
Handling Instructions
18
Wall Mounting Installation
18
Wall Mounting Guidelines
18
Wall Bracket Installation - Stud Walls
18
Wall Bracket Installation - Solid Walls
19
Boiler Mounting
19
Section IV - Boiler Piping
20
General Piping Requirements
20
Pressure Relief Valve
20
Low Water Cutoff Device
20
Boiler Piping
21
Additional Limit Control
22
Backflow Preventer
22
Boiler System Piping Applications
22
Expansion Tank and Makeup Water
22
Diaphragm Expansion Tank
23
Closed-Type Expansion Tank
23
Circulator
23
Sizing Primary Piping
23
Domestic Hot Water System Piping
23
System Piping - Zone Circulators
23
System Piping - Zone Valves
25
System Piping - through Boiler
25
System Piping - Radiant Heating
25
System Piping - Special Applications
25
System Piping - Multiple Units Installation
25
Section V - Installing Vent / Combustion Air & Condensate Drain
31
Installing Vent and Combustion Air
31
Installing Condensate Drain Assembly
31
Section VI - Gas Piping
33
Gas Supply Piping Connection
33
Natural Gas
34
Pipe Sizing -Natural Gas
34
Natural Gas Supply Pressure Requirements
34
Propane Gas
35
Pipe Sizing - Propane Gas
35
Propane Gas Supply Pressure Requirements
35
Gas Piping
36
Section VII - Internal Wiring
37
General Requirements
37
Control Module Circulator AMP Ratings
37
Wiring Tool Instructions
37
Section VIII - External Wiring
39
Installation Compliance
39
Line Voltage Connections
39
Domestic Hot Water Aquastat Wiring
39
Thermostat Wiring
39
CH and DHW Circulator
41
System Circulator - Zone Valve Application
41
Outdoor Reset Control
41
Additional 24V Limit Wiring
41
External Wiring
42
Section IX - Start-Up Preparation
44
Check Boiler System Water Chemistry
44
Water Ph Level 6.0 to 8.0
44
Water Hardness Less than 7 Grains
44
Chlorinated Water
44
Check and Test Antifreeze
44
Use of Antifreeze in the Boiler System
45
Filling the Boiler System
45
Check Low Water Cut-Off Device
45
Check for Gas Leaks
46
Check Thermostat Circuit
46
Inspection of Condensate Drain Assembly
46
Section X- Start-Up Procedures
47
Final Checks before Start-Up
47
PRESTIGE solo Start-Up
47
If PRESTIGE solo Does Not Start Correctly
47
Check the PRESTIGE solo and System
47
Operating Instructions
49
Set Boiler CH Target Temperature
50
Operation Verification - Space Heating
50
Operation Verification - Domestic Hot Water
51
Standby Mode
51
Boiler Control Display
52
Standby Mode
52
Setting the Boiler Parameters
54
Parameter Mode
54
Accessing Boiler Information
54
Information Mode
54
Error (Hard Lockout) Mode
55
Section XI - Outdoor Reset Control
56
Mounting the Outdoor Sensor
56
Wiring the Sensor
56
Summer/Winter Switch at Boiler
56
Boiler CH Target Temperature Setting
57
Setting the Boiler CH Target Temperature
57
Section XII - Check-Out Procedures
59
Check-Out Procedures
59
Section XIII - Installation Record
60
Installation Record
60
Sections XIV - Maintenance Schedule
61
Owner Maintenance
61
Section XV - Maintenance Procedures
62
Maintenance Procedures
62
Reported Problems
62
Check Surrounding Area
62
Inspect Burner Area
62
Check System Piping
62
Clean Condensate Drain Assembly
63
Check Ventilation Air Openings
63
Inspect Vent and Combustion Air Piping
63
Check Boiler System
63
Check Expansion Tank
64
Check Boiler Relief Valve
64
Inspection of Ignition Electrode
64
Check Ignition Wiring and Ground Wiring
64
Check Control Wiring
65
Check Control Settings
65
Perform Start-Up and Checkout Procedure
65
Check Burner Flame
65
Check Flame Signal
66
Check Combustion Levels
66
Check Flue Gas Temperature
66
Clean Heat Exchanger
66
Review with Owner
67
Handling Previously Fired Combustion Chamber Insulation
67
Replacement Parts
68
Replacement Parts
70
Product Specifications
72
Specifications
73
Advertisement
TriangleTube Prestige Solo 110 Manual (44 pages)
Brand:
TriangleTube
| Category:
Boiler
| Size: 5 MB
Table of Contents
Table of Contents
3
Product and Safety Information
7
Chapter 1 - Pre-Installation Requirements
9
Ventilation and Combustion Air Requirements
9
Removal of an Existing Boiler from a Common Vent System
10
Vent/Combustion Air Piping and Materials
10
PVC and CPVC Vent and Combustion Air Piping and Fittings
11
PVC and CPVC Pipe Cement and Primer
11
AL29-4C® Stainless Steel Vent Piping and Fittings
11
Polypropylene (PP) Vent Piping and Fittings
11
Vent/Combustion Air Equivalent Lengths
12
Vent Restrictions
12
Inch (60 MM) Vent System Restrictions
12
Rigid Polypropylene Vent System Restrictions
13
Flex Polypropylene Vent System Restrictions
13
Combustion Air Contamination
14
Chapter 2 - Direct Vent Installation of Vent/Air Piping
19
Direct Vent - Vertical - through the Roof or Unused Chimney
19
Determine Termination Location
19
Direct Vent - Vent Installation - through the Roof
20
Fig. 1 - Direct Vent - Vertical Termination of Vent and Combustion Air Piping
20
Termination Fittings - through the Roof
21
Direct Vent - Multiple Boiler Installation - through the Roof
21
Fig. 2 - Termination Clearances of Direct Vent System
21
Fig. 3 - Vertical Vent Bird Screen Installation
22
Fig. 4 - Vertical Combustion Air Bird Screen Installation
22
Fig. 5 - Direct Vent - Vertical Termination of Multiple INSTINCT Boilers
22
Direct Vent - Horizontal - Sidewall
23
Determine Termination Location
23
Direct Vent - Vent Installation - Sidewall
24
Termination Fittings - Sidewall
24
Fig. 6 - Direct Vent - Sidewall Termination of Vent and Combustion Air Piping
25
Fig. 7 - Direct Vent - Alternate Sidewall Termination of Vent and Combustion Air Piping
25
Fig. 8- Direct Vent - Sidewall Snorkel Termination of Vent and Combustion Air Piping
25
Direct Vent - Multiple Boiler Installation - Sidewall
26
Fig. 9 - Sidewall Vent Bird Screen Installation
26
Fig. 10 - Sidewall Combustion Air Bird Screen Installation
26
Fig. 11 - Direct Vent - Sidewall Termination of Multiple INSTINCT Boilers
27
Fig. 12 - Direct Vent - Vertical Vent and Side Wall Combustion Air Terminations
27
Direct Vent - Vertical Vent and Sidewall Combustion Air
28
Determine Termination Location
28
Direct Vent - Vent Installation - through the Roof
29
Direct Vent - Combustion Air Installation - Sidewall
29
Termination Fittings - Vertical & Sidewall
30
Direct Vent - Multiple Boiler Installation - Vertical Vent and Sidewall Combustion Air
30
Fig. 13 - Direct Vent - Vertical Vent and Sidewall Combustion Air Terminations of
30
Chapter 3 - Category IV (Indoor Air) Installation of Vent/Air Piping
31
Fig. 14 - Ventilation and Combustion Requirements Sticker Placed on the Appliance
31
Category IV - Vertical - through the Roof or Unused Chimney
32
Determine Termination Location
32
Fig. 15 - Category - IV - Vertical Termination of Vent Pipe
32
Category IV - Vent Installation - through the Roof
33
Termination Fittings - through the Roof
33
Fig. 16 - Termination Clearances of Category IV System
33
Category IV - Multiple Boiler Installation - through the Roof
34
Category IV - Horizontal - Sidewall
34
Determine Termination Location
34
Fig. 17 - Category IV- Vertical Termination of Multiple INSTINCT Boilers
34
Fig. 18 - Category IV - Sidewall Termination of Vent Pipe
35
Fig. 19 - Category IV - Sidewall Snorkel Termination of Vent Pipe
35
Category IV - Vent Installation - Sidewall
36
Termination Fittings - Sidewall
36
Category IV - Multiple Boiler Installation - Sidewall
36
Fig. 20 - Category IV - Sidewall Termination of Multiple INSTINCT Boilers
36
Chapter 4 - Installation Requirements
37
Vent/Combustion Air Transitions
37
3" (80 MM) to 2" (60 MM) Transitions
37
Fig. 21 - 2" (60 MM) CPVC/PVC Venting System Vertical
37
Fig. 22 - 2" (60 MM) CPVC/PVC Venting System Horizontal
37
Connect Piping to INSTINCT
38
Vent and Combustion Air Piping Installation
39
PVC/CPVC Vent System
39
Polypropylene or AL29-4C® Stainless Steel Vent Systems
40
Carbon Monoxide Detector Installation
40
Chapter 5 - Commonwealth of Massachusetts Installation Requirements
41
Installation of Carbon Monoxide Detectors
41
Approved Carbon Monoxide Detectors
41
Signage
41
Inspection
41
Exemptions
41
Manufacturer Requirements - Gas Equipment Venting System Provided
42
Manufacturer Requirements - Gas Equipment Venting System Not Provided
42
TriangleTube Prestige Solo 110 Manual (5 pages)
Propane to Natural Gas Conversion
Brand:
TriangleTube
| Category:
Boiler
| Size: 0 MB
Table of Contents
Electrical Shock Hazard
2
Preliminary Instructions
2
Removal of Propane Venturi
2
Install the Natural Gas Venturi
2
Install the New Venturi/Blower Gasket
3
Reinstall the Venturi to the Fan Assembly
3
Reassemble the Gas Valve to Venturi Pipe
3
Install the Venturi Interface and Air Inlet Elbow
3
Open the Manual Gas Shut off Valve and Test for Leaks
3
Attach the Natural Gas Conversion Label and Rating Label
3
Enter the Natural Gas (NG) Appliance Code
3
Combustion Test and Adjustments
4
Manual Operation
4
Adjust the Firing Rate and Throttle Screw
4
Set Combustion Levels at High Fire and Low Fire
4
Shutdown Burner and Exit Service Mode
5
Replace the Front Panel and Put the Boiler Back into Operation
5
TriangleTube Prestige Solo 110 Manual (14 pages)
HX Field Replacement Kit
Brand:
TriangleTube
| Category:
Industrial Equipment
| Size: 1 MB
TriangleTube Prestige Solo 110 Instructions (5 pages)
Brand:
TriangleTube
| Category:
Boiler
| Size: 0 MB
Advertisement
Related Products
TriangleTube Prestige Solo 399
TriangleTube Prestige Solo 175
TriangleTube Prestige Solo 60
TriangleTube Prestige Solo110
TriangleTube Prestige Solo 250
TriangleTube Instinct SOLO 155
TriangleTube Instinct SOLO 199
TriangleTube Prestige Slol 250
TriangleTube Prestige Excellence
TriangleTube prestige
TriangleTube Categories
Boiler
Speakers
Water Heater
Boiler Supplies
Control Unit
More TriangleTube Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL