Chapter 14 - Check-Out Procedures - TriangleTube PRESTIGE Excellence 110 Installation & Maintenance Manual

Hide thumbs Also See for PRESTIGE Excellence 110:
Table of Contents

Advertisement

CHAPTER 14 - CHECK-OUT PROCEDURES

NOTICE
Perform the following check-out procedures
as outlined and check off items as complet-
ed. When procedures are completed, the in-
staller should complete the installation record
in Chapter 15 on page 65.
q Domestic inner tank is filled with water.
q Central/space heating outer tank is filled with wa-
ter.
q Boiler system fluid chemistry checked and verified
as outlined in Section 10.1 on page
q Boiler system was completely flushed to remove
any debris/sediment.
q Any automatic air vents placed within the system
are open one full turn.
q Air is purged from the heating zones and boiler sys-
tem piping.
q If applicable, confirm that the burner has been
properly configured for Propane as outlined in Sec-
tion 6.3 on page
27.
q Thermostat circuit wiring checked and verified that
no voltage is present as outlined in Section 10.5 on
page
53.
q Operating Instructions on page 54 were followed
during start-up.
q Combustion levels and flame pattern verified as
outlined in Section 11.3.5 on page 56.
q Measured the rate of input on Natural Gas as out-
lined in Section 11.3.6 on page 57.
q Test high temperature limit as outlined in Section
11.3.7 on page 57.
q Checked the incoming gas pressure to the PRES-
TIGE Excellence to ensure a minimum pressure of
5"w.c during flow conditions to all gas appliances
and a maximum pressure of 13"w.c during non-
flow conditions for Natural and Propane.
q Adjusted balancing valves and system limit con-
trols to provide design temperatures to the primary
space heating system.
51..
q In multiple zone applications, adjusted for correct
flow of boiler water to each zone.
q Checked and verified room thermostat(s) function
properly and the thermostat(s) heat anticipator (if
used) was properly set.
q Observed several operating cycles for proper oper-
ation of the PRESTIGE Excellence and the system.
q Set the room thermostat(s) to the desired room
temperature.
q Reviewed all instructions shipped with the PRES-
TIGE Excellence with the homeowner or mainte-
nance personnel.
q Completed the Installation Record of Chapter 15
on page 65.
q Ensure all manuals and other documents are re-
turned to the Installation envelope and given to
the owner for safekeeping.
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents