FP POSTBASE ONE Operator's Manual page 160

Hide thumbs Also See for POSTBASE ONE:
Table of Contents

Advertisement

160
PostBase One Mailing System
Insert housing connector
Housing connector
Coupling feeder – sealer – dynamic scale – postage meter
Housing connector
• Place the PostBase One and its optional
Please refer to page 173 for the standing sur-
face values of the system in different config-
urations.
The components of the mailing system are
mechanically coupled and thus fixated with
regard to their position in relation to one
another by means of housing connectors.
• Slightly lift the postage meter on its right
On the dynamic scale and the feeder:
• Insert the connectors in the same way into
• Slightly lift the sealer on its left side, move
• Slightly lift the dynamic scale on its left
• Slightly lift the postage meter on its left
Postage meter
If your mailing system does not comprise all
components mentioned, couple those you
use in the described way.
components on a firm, level, low vibration
horizontal base.
side and slide the connector into the clear-
ance of the housing.
the right side wall.
it close to the feeder and position it on the
connector.
side, move it close to the sealer and posi-
tion it on the connector.
side, move it close to the dynamic scale,
and position it on the connector.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POSTBASE ONE and is the answer not in the manual?

Table of Contents