Control Horn Installation - Seagull Models EDGE 540 EP Assembly Manual

Table of Contents

Advertisement

3) While holding the vertical stabilizer
firmly in place, use a pen and draw a line on
each side of the vertical stabilizer where it
meets the top of the fuselage.
Pen.
4) Remove the stabilizer. Using a mod-
eling knife, remove the covering from below
the lines you drew.
When cutting through the covering to re-
move it, cut with only enough pressure to
only cut through the covering itself. Cutting
into the balsa structure may weaken it.
5) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
www.seagullmodels.com
aligned correctly, mix up a generous amount of
30 Minute Epoxy. Apply a thin layer to the mount-
ing slot in the top of the fuselage and to the sides
and bottom of the vertical stabilizer mounting
area. Apply epoxy to the bottom and top edges
of the filler block and to the lower hinge also.
Set the stabilizer in place and realign. Double
check all of your measurements once more be-
fore the epoxy cures. Hold the stabilizer in place
with T-pins or masking tape and remove any
excess epoxy using a paper towel and rubbing
alcohol. Allow the epoxy to fully cure before
proceeding.
Remove
covering.
Horizontal
90º
Stabilizer.
6) When you are sure that everything is
C/A glue.

CONTROL HORN INSTALLATION.

Control horn install as same as method of
aileron wing. See pictures below.
Vertical
Stabilizer.
9

Advertisement

Table of Contents
loading

Table of Contents