Changing The Fuse - Keysight N7744A User Manual

N774 series optical multiport power meter
Hide thumbs Also See for N7744A:
Table of Contents

Advertisement

W A R N I N G

Changing the Fuse

C A U T I O N
Keysight N774x Series
When the instrument is in stand-by mode, the Pwr LED is orange. When
the instrument is powered-on, the Pwr LED is green.
To avoid the possibility of injury or death, you must observe the following
precautions before switching on the instrument.
Insert the power cable plug only into a socket outlet provided with a protective
earth contact. Do not negate this protective action by using an extension cord
without a protective conductor.
Do not interrupt the protective earth connection intentionally.
The AC power requirements are summarized on the rear panel of the
instrument.
Figure 2
AC Power Requirement Markings
There is no user replaceable fuse for the instrument. Changing the fuse should be
carried out only by Keysight Technologies service personnel. If you need to get
the fuse replaced refer to your nearest Keysight Technologies Sales/Service
Office.
1
Getting Started
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N7745aN7747aN7748a

Table of Contents