Figure 2-3 Connections For Factory Dc Volts Calibration; Table 2-7 Remote Precalibration Steps - Keithley 2182 Service Manual

Nanovoltmeter
Hide thumbs Also See for 2182:
Table of Contents

Advertisement

2-14
Calibration
Precalibration
1.
2.
Figure 2-3
Connections for factory DC volts calibration
Model 2182
NOTE
3.
Table 2-7
Remote precalibration steps
Precalibration step
10V
0V
1V
NOTE
Connect the calibrator to CHANNEL 1 of the Model 2182 input jack using the low-
thermal cable, as shown in
before proceeding. (See
Table 2-3
Set the calibrator to output DC volts, and turn external sense off.
2107 Low
Red (CH1)
Thermal Cable
Green (CH2)
CHANNEL 1
!
CHANNEL 2
Black (CH1)
White (CH2)
Keep drafts away from low-thermal connections to avoid thermal drift, which could
affect calibration accuracy.
Perform the precalibration steps summarized in
Set the calibrator to the indicated voltage, and make sure the unit is in operate.
Allow the signal voltage to settle.
Send the indicated programming command.
Wait until the Model 2182 completes each step before continuing.
Calibrator voltage
10.000000V
0.0000000V
1.0000000V
Keep the calibrator locked to the 11V range.
Figure
2-3. Wait two minutes to allow for thermal equilibrium
for Model 2107 cable connections.)
OUTPUT HI
DC Voltage Calibrator
OUTPUT LO
Table
Calibration command
:CAL:PROT:PCAL:STEP0 10
:CAL:PROT:PCAL:STEP1 0
:CAL:PROT:PCAL:STEP2 1
2-7. For each step:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2182a

Table of Contents