Remote Factory Calibration - Keithley 2182 Service Manual

Nanovoltmeter
Hide thumbs Also See for 2182:
Table of Contents

Advertisement

Remote factory calibration

Follow the steps in this section to perform factory calibration via remote. See
a detailed list and description of SCPI calibration commands.
When sending calibration commands, be sure that the Model 2182 completes each step before
sending the next command. You can do so either by observing the front panel PRECAL or
CALIBRATING message, or by detecting the completion of each step over the bus. Be sure to
include a space character between each command and parameter.
The procedures for factory calibrating the Model 2182 using SCPI commands include:
Preparing the Model 2182 for factory calibration
Precalibration
Front panel short and open calibration
DC volts calibration
Analog output calibration
Programming calibration dates
Saving calibration constants
Locking out calibration
Preparing the Model 2182 for factory calibration
1.
Connect the Model 2182 to the IEEE-488 bus of the computer using a shielded
IEEE-488 cable, such as the Keithley Model 7007, or connect the unit to a computer
through the RS-232 port using a straight-through 9-pin to 9-pin cable (use a 9-25-pin
adapter if necessary).
2.
Press in and hold the STEP key, then turn on the Model 2182, and allow it to warm up
for 2-1/2 hours before performing calibration.
3.
Select the DCV1 function.
4.
Make sure the primary address of the Model 2182 is the same as the address specified in
the program that you will be using to send commands. (Use the GPIB key.)
5.
Unlock the calibration function by sending these commands:
:DIAG:KEIT:CAL:UNLOCK
:CAL:PROT:CODE 'K1002182'
(The above command shows the default code, KI002182. Substitute the correct code if
changed.)
6.
Send the following command to initiate calibration:
:CAL:PROT:INIT
Calibration
2-13
Appendix B
for

Advertisement

Table of Contents
loading

This manual is also suitable for:

2182a

Table of Contents