Pre-Start Inspection - JLG 400SJ Operation And Safety Manual

Table of Contents

Advertisement

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

Pre-Start Inspection

The Pre-Start Inspection should include each of the follow-
ing:
1. Cleanliness – Check all surfaces for leakage (oil, fuel,
or battery fluid) or foreign objects. Report any leakage
to the proper maintenance personnel.
2. Decals and Placards – Check all for cleanliness and
legibility. Make sure none of the decals and placards
are missing. Make sure all illegible decals and placards
are cleaned or replaced.
3. Operation and Safety Manuals – Make sure a copy of
the Operator and Safety Manual, AEM Safety Manual
(ANSI markets only), and ANSI Manual of Responsibili-
ties (ANSI markets only) is enclosed in the weather
resistant storage container.
4. "Walk-Around" Inspection – Refer to Figure 2-2. thru
Figure 2-4.
5. Battery – Charge as required.
6. Fuel (Combustion Engine Powered Machines) – Add
the proper fuel as necessary.
3121216
7. Engine Oil Supply - Ensure the engine oil level is at the
Full mark on the dipstick and the filler cap is secure.
8. Hydraulic Oil – Check the hydraulic oil level. Ensure
hydraulic oil is added as required.
9. Accessories/Attachments - Reference the Operator
and Safety Manual of each attachment or accessory
installed upon the machine for specific inspection,
operation, and maintenance instructions.
10. Function Check – Once the "Walk-Around" Inspection
is complete, perform a functional check of all systems
in an area free of overhead and ground level obstruc-
tions. Refer to Section 4 for more specific operating
instructions.
IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE
MACHINE IMMEDIATELY! REPORT THE PROBLEM TO THE PROPER
MAINTENANCE PERSONNEL. DO NOT OPERATE THE MACHINE UNTIL
IT IS DECLARED SAFE FOR OPERATION.
– JLG Lift –
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

400s

Table of Contents