SECTION 5 - EMERGENCY PROCEDURES
Platform or Boom Caught Overhead
If the platform or boom becomes jammed or snagged in
overhead structures or equipment, rescue platform occu-
pants prior to freeing the machine.
5-2
5.4
EMERGENCY TOWING PROCEDURES
Towing this machine is prohibited, unless properly
equipped. However, provisions for moving the machine
have been incorporated. For specific procedures, refer to
Section 4.
– JLG Lift –
3121216