Commissioning

Diagrammatic
The commissioning guide which follows explains the different steps that
representation
have to be taken to commission the OP. Figure 15-1 shows the most impor-
tant steps for initial commissioning, recommissioning and normal operation
of the OP.
Initial Commissioning
No configuration/firmware
exists on the OP.
Download configuration data to OP
ProTool
COM1/2
Figure 15-1 Commissioning Flowchart
Equipment Manual OP7, OP17
Release 04/99
Recommissioning
The OP already contains a
configuration but you want to
change the configuration or
use a new one.
Switch on power supply of the OP
Switch the OP to download mode
during the startup phase
(see chapter 15.2).
Start screen or standby message
15
Normal Operation
The OP is operated with the
loaded configuration.
OP
15-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Op17

Table of Contents