Needle valve.
3) Install the muffler and muffler extension
onto the engine and make the cutout in the
cowl for muffler clearance. Connect the fuel
and pressure lines to the carburetor, muffler
and fuel filler valve. Secure the cowl to fuse-
lage using the M3x10mm screws.
ELECTRIC POWER CONVERSION
1) Locate the items neccessary to install the
electric power conversion included with
your model.
WWW.SEAGULLMODELS.COM
3x10mm
- Model size: .46 -.52 size models
- Propeller: 12x6 ~ 13x6
- ESC: 60A
- Lipo Batteries: 4 cell 4200mA
2) Attach the electric motor box to the fire-
wall suitable with the cross lines drawn on
the electric motor box and firewall. Using
epoxy and balsa stick to secure the motor
box to the firewall. Please see pictures below.
4x20 mm
13
Need help?
Do you have a question about the SuperDave MX2 and is the answer not in the manual?