Seagull Models SuperDave MX2 Assembly Manual page 11

Table of Contents

Advertisement

2) Use a pin drill and 4mm drill bit to drill a
small indentation in the mount for the en-
gine mounting screw.
4 mm
3) Use a drill to drill the four holes in the en-
gine mount rails.
4) On the fire wall has the location for the
throttle pusshrod tube (pre-drill).
5) Slide the pushrod tube in the firewall and
guide it through the fuel tank mount. Use
medium C/A to glue the tube to the firewall
and the fuel tank mount.
WWW.SEAGULLMODELS.COM
4.2mm
4.2mm
6) Connect the Z-bend in the 600mm throt-
tle pushrod to the outer hole of the carbure-
tor arm.
7) Slide the throttle pushrod wire into
the tube. Position the engine between the
mounts. Use four M4x30mm machine
screws to secure the engine to the mount as
shown.
M4x30mm
8) Reinstall the servo horn by sliding the
connector over the pushrod wire. Center the
throttle stick and trim and install the servo
horn perpendicular to the servo center line.
Pushrod wire.
11 11

Advertisement

Table of Contents
loading

Table of Contents